Hills FD88010 Gebrauchs- und Pflegehandbuch Seite 6

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 12
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 5
6
5.2 Startfromtheoutsideline.Untiethe
PVClinefromthelinetieoffsaddle
ononesideofarmonly.PullPVCline
through one clip at a time until line is
taught.RetiePVClinearoundlinetie
off saddle. Trim off any excess line if
required.Pushlineintotheholein
the arm.
5.3 Working towards the centre of the
Rotary Hoist adjust the remaining
lines.
Do not over tension the lines.
GENERAL ASSEMBLY DETAILS
ALL DIMENSIONS ARE EQUAL ABOUT UNLESS 1.
OTHERWISE STATED.
DIMENSIONS BOUNDED BY ARE CRITICAL FOR 2.
ASSEMBLY WITH OTHER COMPONENTS.
THE DIMENSIONS SHOWN ON THIS DRAWING PLUS 3.
THE 3D CAD DATA FULLY DEFINE THE FINISHED PART.
ALL COMPONENTS TO BE CLEAN AND FREE FROM 4.
SHARP EDGES, BURRS AND DEFECTS.
IF IN DOUBT ASK5.
C
L
GENERAL TOLERANCES:
Unless Otherwise Stated:
0 Dec. place 0.5mm
1 Dec. place 0.25mm
2 Dec. place 0.10mm
Holes: +0.25mm -0mm
Angles: 0.25
D423
2010
Revision 4 - 09.02.10 - DHN
6
D
C
B
A
E
F
G
H
E
A
B
C
D
F
54321 211101987
87654321
G
2111019
H
MID MARKET ROTARY
Project Number
Project:
X. Xxxxxxxx
DO NOT SCALE DRAWING.
Projection.
:etaD:devorppA
Date:
XX.XX.XX
Checked:
22.09.10P. Stevens
Sheet
1
DIMENSIONS IN MILLIMETRES.
Date:
Drawn:
Issued / Received Issue:
Sheet 1 of 1
TM
Colour:
Material:
Finish:
Description
A2
Drawing Number
Third Angle
size
FD88012
EVERYDAY ROTARY 47
REFER TO INDIVIDUAL COMPONENTS
9534 (grams)
REFER TO DRAWING SPECIFICATION
REFER TO COLOUR TABLE
SCALE:1:2
Volume 2215249 (m)
Estimated Mass:
Hills Industries Limited
ABN 35 007 573 417
Home & Hardware Products
Unit H, 5 Butler Boulevard
Burbridge Business Park
Adelaide Airport
South Australia 5950
Copyright
©
Additives:
ISSUEREF .REV ISIONDATERFC DWN. CHK. APP.
1 SP01.90.22KROWTRA ROF DESAELER
Step 5
Tensioning the Lines
The lines are pre-tensioned in the factory.
No initial tensioning is required.
If over time, the line does need tensioning,
the Rotary Hoist must be in the open
position.
5.1 Insert the Rotary Hoist into the ground
socket, open up and lock into position
(Fig. 5).
Line Tensioning
Fig. 5
Tensioning arm Line clip arm
Seitenansicht 5
1 2 3 4 5 6 7 8 9 10 11 12

Kommentare zu diesen Handbüchern

Keine Kommentare